For FP&A Analysts
You’re an FP&A analyst. You live in your ERP, your data warehouse, your spreadsheets, and your LLM. Claresia adds 5 skills that compress the most repetitive parts of your week.
What landed in your LLM
Section titled “What landed in your LLM”For the FP&A Cowork:
| Skill | When you’d use it |
|---|---|
ledger.budget-vs-actual | Mondays + month-end |
ledger.variance-analysis | When variance > 5% on any line |
ledger.month-end-checklist | Days 1–5 of every month |
ledger.forecast-rebase | After every quarter close |
ledger.board-pack-draft | Board prep weeks |
If you’re a Controller, add ledger.vendor-spend-review.
Day 1 — Monday budget vs actual
Section titled “Day 1 — Monday budget vs actual”You start your Monday with a 30-min flash. You type:
@claresia.ledger.budget-vs-actualParameters:
- Department:
Engineering(orall) - Period:
month_to_date - Currency:
EUR
Returns:
- Top-line variance per category (Headcount, T&E, SaaS, Cloud)
- Drivers per variance > 2%
- Comparison vs same period last year
- Any one-time items called out
You skim, drop the headlines into your Slack #finance channel.
Day 2 — variance > 5%, drill down
Section titled “Day 2 — variance > 5%, drill down”The Engineering SaaS line is +12% vs budget. You type:
@claresia.ledger.variance-analysisParameters:
- Subject:
Engineering SaaS Q3 actual vs budget - Drill depth:
vendor + team + period
Returns:
- The 3 vendors driving the variance (e.g., +$84K Datadog from new instance, +$22K JFrog upgrade)
- Whether the variances were approved (cross-references your purchase orders)
- Suggested actions:
- “Negotiate Datadog at renewal — $32K/mo run-rate is now your top spend”
- “Tag JFrog upgrade in your forecast for Q4 baseline”
- Estimated annual run-rate if uncorrected
You forward to the Engineering business partner with the action items.
Day 3 — month-end checklist
Section titled “Day 3 — month-end checklist”It’s day 2 of the month. You type:
@claresia.ledger.month-end-checklistReturns the structured checklist tailored to your tenant + the previous month’s actuals:
Day 1 (today)
- Pull GL extracts from SAP — done
- Reconcile bank statements
- Run AR aging
Day 2
- Vendor spend reconciliation (top 25)
- HR roster vs payroll cross-check
- Inventory adjustments
Day 3
- Variance analysis (Eng + Mfg + Mktg + GA)
- Tax accruals
Day 4
- Draft monthly close memo
- Board pack pre-draft (if board month)
Day 5
- Final review with Controller
- Close
You check items off in your project tool; the skill can re-run later in the month to refresh status.
Day 4 — forecast rebase post-quarter
Section titled “Day 4 — forecast rebase post-quarter”End of Q3. You type:
@claresia.ledger.forecast-rebaseParameters:
- Period:
Q3 2026 close → FY26 forecast rebase - Macro adjustments:
EUR/USD 1.07 (down from 1.09); EU mfg PMI 50.2 (flat) - Drivers updated:
Engineering headcount approved +6 for Q4
Returns:
- New FY26 forecast vs prior
- Drivers of the change
- Sensitivity analysis (best / base / bear cases)
- Suggested narrative for the CFO’s executive summary
Logged to Hub. The CFO can click through to the full reasoning.
Day 7 — board pack week
Section titled “Day 7 — board pack week”It’s board pack week. You type:
@claresia.ledger.board-pack-draftParameters:
- Quarter:
Q3 2026 - Board template:
dainese-board-q3-template - Sections to draft:
Financial summary, Cash position, Variance commentary, Year-end forecast, Major risks
Returns a 4–6 page draft following your template structure. You take 2 hours to refine vs the 8 you’d otherwise spend on a clean draft.
Hub deep-link footer
Section titled “Hub deep-link footer”Every response logs to a Hub output record with full provenance. The CFO,
Controller, and your audit team can verify any number traces to your skill
invocation + your data sources.
Tips from real FP&A analysts
Section titled “Tips from real FP&A analysts”- Run budget-vs-actual every Monday morning. It becomes the 5-min Monday flash that drives the rest of your day.
- Variance-analysis for any line > 5%. The skill catches drivers you’d spot in your second-pass review anyway — running it first compresses the cycle.
- Month-end-checklist is a calendar, not a guilt trip. Use it to parallelize with your Controller and AP team.
- Board-pack-draft is the highest-ROI skill in your toolkit. Saves 4–6 hours per board meeting.
- The Hub trail makes audit prep easier. Every variance commentary you ever produced is queryable by date / department / driver.
Maturity progression
Section titled “Maturity progression”L0 → L1 in ~4 weeks (you’ll likely hit it in 2 if you adopt the Monday + month-end cadence). L1 → L2 in ~14 weeks.
L2 markers for FP&A:
- Pass the Agent Operator Certification (Forge)
- Author at least 1 custom skill (e.g., your tenant’s specific COGS reconciliation)
- Use 5+ skills in a typical week
@claresia.forge.coaching-session- Your CSM channel
- This docs site